Complete Colonial Newel Posts are used on new staircases or when replacing the entire newel post. Can be used at the bottom and top of the stair case - Select type and timber using the drop-down box below
Read More£40.50
ITEM IN-STOCK Delivery Within 5 Working Days
FREE
Complete newel posts are turned from one section of timber and include the newel turn top section and newel base square bottom section.
The Pre-Drilled head allows you to select any type of newel post cap to finish the post. If you wish to have a Flat cap or Pyramid style cap fixed to your post please let us know and we will send your posts with a flat top head ready for the cap to be glued into position.
The complete type newel has been designed for new build staircases or to replace your entire newel post.
Complete Newel posts are supplied in two profiles, each with it specific purpose on a staircase.
The full 90mm x 90mm Full Newel. This is the most commonly used post on most stair configurations. It is designed for the bottom of the stair case, top of the staircase, used as mid posts and corner posts on a landing.
The 90mm Half Newel Post. Used up against a wall to finish the handrail run. This post is fixed by screwing and gluing it directly to the wall using suitable fixings. Screws should be positioned so that they are hidden from view by the handrail.
Find the full range of Colonial Turned Stair Parts here.
Newel Posts are fitted first followed by base rails and handrails.
Remember that handrail height needs to be 900mm.
The bottom post is housed over the stair string (the side of the staircase) and fixed into position fixing through the side of the post and through the string using tapered dowels or suitable wood screws. Screws should be countersunk into the timber so they can be plugged or filled to match the timber.
Top posts and landing posts are fixed using a lap joint to the joist under the floorboards at the top of the stairs and secured using suitable wood screws. Remember to always drill pilot holes into hardwoods.
You can use Zip Fix UT Newel Post fasteners if you prefer. These secure the post to concrete or timber sub floors.
Half newel posts are glued and screwed directly to the wall. Place the screws through the head of the post where the handrail will cover them.
We recommend laying out your stair components to ensure handrail heights are 900mm before you cut any existing newel posts.
Handrail have to be a minimum of 900mm high for domestic staircases.
Handrail heights on the staircase are measured from the front bullnose of a step to the top of the handrail.
Handrail heights on the landing are measured from the floor to the top of the handrail.
Spindles must not allow a sphere 100mm in diameter to pass between two spindles.
If you are unsure please contact us or your building inspector for new builds.
You can download the Cheshire Mouldings Benchmark Fitting Instructions manual from here
90mm x 90mm Full Newel Post - For Domestic Stairs
OP230
OP196
90mm Half Newel Post - Domestic Stairs
OP230HALF
OP196HALF
You can download the Cheshire Mouldings Benchmark Fitting Instructions manual from here
There are no reviews for this product at the moment
Please log in to leave a review